Follow along with the video below to see how to install our site as a web app on your home screen.
ملاحظة: This feature may not be available in some browsers.
بسبب حظر التراخيص سيتسبب ذلك في خسارة ملايير كثيرة وايقاف مشاريع طويلة الامد مثل التي مع سيكورسكي
TEI - T700-TEI-701D
www.tei.com.tr
Future projections indicate that if the T70 helicopter is procured abroad and if the customer selects the T700-TEI-701D engine produced under license by TEI, these engines can be exported abroad.
In the serial production phase which is expected to launch between 2020 and 2025, a total of 248 T700-TEI-701D engines (236 committed and 12 optional) will be produced. Within the program the objective is also to achieve the capacity to produce 1 engine per week in the later stage of the serial production phase.
Groundbreaking Ceremony held for the Construction of the Turboshaft Test Center Building (Phase-2) Project
During the event, the groundbreaking ceremony for the construction of the Turboshaft Test Center buildings was also held. TEI will produce a 1400 shp domestic and national turboshaft engine that will power the T625 GÖKBEY 6 Ton Utility Helicopter in line with the project initiated by the Presidency of Defence Industries signed on February 7, 2017 in order to meet the engine requirements of the helicopter developed for the Turkish Land Forces Command.
While the core engine designed by TEI runs stably at 28,000 RPM, during the project great progress has been achieved in understanding the engine’s constant operation speed and idle speed.
The Turboshaft Test Center will have an area of 30,000 m2 with 19 different test rooms as well as workshops and offices with a 500 personnel capacity. With the launch of the building, the need for the TEI-TS1400 engine’s overseas testing will be reduced, and with the development of domestic testing capability, the aim is also to reduce foreign dependency. With the activation of this facility, the tests for similar class engine projects to be developed will be completed and commissioned quickly and efficiently
سجل دخولك أو قم بالتسجيل الآن. لمشاهدة المحتوى المخفي
يبدو ان الانتاج المتسلسل لن يبدأ وكل تلك الاموال ستضيع , المنتوجات والقطع الامريكية توجد في كثير من المشاريع التركية !
لازلت تكابر حتى الآن وتكذب ؟قاتل الله الغباء و الجهل وثقافة النسخ لصق بدون وعي او فهم!!!!
Core engine هنا مقصود به المحرك كاملا الذي يدور بسرعة 28,000 RPM!!!!!
للمرة الالف لايوجد Part في التوربينات الغازية بجميع انواعها يسمي core !!!!
وان كان هناك عليك ياخبير الضراط ان تخبرنا ماهي وظيفته داخل المحرك او لاتتحدث فيما لا تفقه!!!
بعيدا عن مصادرك اللبهلوانية!!!
من F-35 و تحديث شامل لسلاح الجو و تشغيل حاملة طائرات ..
إلى S-400 و عقوبات ..
أمان ربي أمان ..
شهرين ويودع ماذا يستطيع ان يفعل في شهرين وعجز عنه في اربع سنواتقناعتي تزداد ساعه بعد ساعه بأن ترامب قبل مغادرته البيت
سيقلب الشرق الاوسط رأسا على عقب وبشكل لا يُحمد عقباه
نحتاج وقت اكثر لنرى فعاليه واستمراريه هذه العقوبات وردود الفعل المتبادله بين الطرفين
ضربه قاسيه للصناعات التركيه وبدايه جوله جديده من التوتر التركي الامريكي
misr