رسميا 25 مقاتلة فايبر للمغرب وتطوير 23 بلوك 52 لنفس المستوى ب 4.772 مليار دولار

اولى صور لطيار مغربي بالباتش الخاص ب
BLOCK 72 التسليم بقي له اشهر من الآن

IMG-20260507-WA0018.jpg
IMG-20260507-WA0017.jpg
 
Chief Financial Officer Evan Scott explained that F-16 deliveries had been delayed due to some issues experienced during flight tests of aircraft in the Taiwan and Morocco production run, which have a new configuration. This created some necessary rework, but Scott advised that since then there had been a successful flight test and that the program was back on track, with the delivery of the first aircraft of the production lot planned for as soon as that week

برنامج دمج VIPER SHIELD عطل تسليم الطائرات التي عرفت CONFIGURATION جديد فا طبعا 2019 ليست هي 2026 والتسليم قريب جدا

 